Company overview
Montenegrin transmition system operator (CGES) is responsible for operational control over the electric power system.
Monitoring and system control is performed permanently (24/7) from the National Dispatching Center (NDC) control room.
CGES is responsible for the maintenance, development and utilization of the electricity transmission system elements consisting of the transmission lines 1416 km long and 25 substations at 400 kV, 220 kV and 110 kV voltage levels.
Let’s shape the future of energy together
Let’s combine our channels and reach to create year-round marketing momentum! Join Enlit today to shape the future.


