PARITY
PARITY addresses the “structural inertia” of existing distribution networks by delivering a transitional market and network framework that will increase the durability and efficiency of the electricity grid and facilitate the penetration of Renewable Energy Sources (RES) beyond the 50% of the generation mix in the distribution network.
Looking for efficient and transparent local flexibility transactions and reward flexibility in a symmetric way. It will allow the Distribution System Operator (DSO) to improve its management capabilities, network observability and RES hosting capacity.
Project duration: 01 September 2019 - 30 September 2023
Interested in listing your Project in our Directory?
Connect with our team to learn how you can elevate your Project and get a premium position within this established directory.
Get seen. Get noticed. Go premium.
Fill in our form to enquire about a Project Directory Listing today and a member of the Enlit Team will contact you shortly


