Enquire about or pre-register for Enlit Europe 2026 in Vienna
More info
Home
/
TITAN

TITAN

Biogas is produced though processing various types of organic waste. Consisting of two main components – methane and carbon dioxide – this renewable and eco-friendly fuel could be used to produce electricity, heat and car fuel. The EU-funded TITAN project plans to build a scaled fluidised bed reactor to convert biogas into carbon and hydrogen. Project partners anticipate that the reactor will have the capacity to produce 0.6 megatonnes of green hydrogen in 2030. The produced carbon materials will be studied for two use cases: to enhance soil properties and produce silicon carbide materials.

Duration: 1 September 2022 - 31 August 2026

TITAN

Project details

Interested in listing your Project in our Directory?

Connect with our team to learn how you can elevate your Project and get a premium position within this established directory.

Get seen. Get noticed. Go premium.
Fill in our form to enquire about a Project Directory Listing today and a member of the Enlit Team will contact you shortly