EU LIFE Blue GIS 420 kV
Almost all high-voltage electrical switchgear in the last fifty years has used SF6-gas for insulation. SF6 is extremely climate-hostile, with a global warming potential (GWP) of
24,300. Clean air insulation and vacuum switching technology, both of which have a GWP of zero, are increasingly used in 72.5 kV and 145 kV switchgear as an alternative to SF6. Until now, however, these have not been commercially available in 420 kV equipment. Both technologies stand for zero compromise in respect of the environment, health and safety.
The aim of the LIFE Blue project is to demonstrate for the first time the economic viability of a climate-friendly 420 kV gas-insulated switchgear (GIS) completely free of fluorinated greenhouse gases (F-gases) and intentionally free of PFAS – which is not the case with other alternatives to SF6. In addition, the project will deliver the world's first 420 kV low power instrument transformer (LPIT) with cast resin embedded sensors and clean air insulation, replacing conventional current and voltage transformers. The LPIT will offer new digital possibilities in current and voltage metering and additional functions such as power quality measurement and will help to significantly reduce the size and copper cabling of SF6-free GIS solutions.
Backed by EU funding and in partnership with Elia, operator of the electricity transmission network in Belgium, this Blue GIS will be installed at the transmission system operator (TSO) Elia site near Brussels replacing an existing indoor GIS with SF6. The clean air set to be used instead consists of nitrogen and oxygen and has a GWP of zero. Siemens Energy and ELIA entered this partnership in October 2024, which is scheduled to continue until September 2028. Over the course of those four years, both parties will conduct:
1 Step
Development and testing of the LPIT solution for Blue 420 kV GIS
2 Step
Type testing of the CB (including LPIT)
3 Step
Pilot installation of 1 GIS bay in the ELIA substation (including engineering, manufacturing, instrumentation and control)
4 Step
Operation at ELIA substation for 1 year (+5 years) including monitoring, evaluation and technical assessment
Project details
Website
https://www.siemens-energy.com/global/en/home/products-services/product/eu-life-blue-420kV-gis.htmlDuration
1 October 2024 - 30 September 2028Countries
Topics
Subtopics
Programmes
Industry
Academia / Research Institute (Student / Professor / Researcher) and Energy Retailer
Related content
Interested in listing your Project in our Directory?
Connect with our team to learn how you can elevate your Project and get a premium position within this established directory.
Get seen. Get noticed. Go premium.
Fill in our form to enquire about a Project Directory Listing today and a member of the Enlit Team will contact you shortly